Salesforce East
This Project's 30-Story Volume Embodies the Higher Workforce Densities and Flexible Space Planning of Contemporary Offices
This Project's 30-Story Volume Embodies the Higher Workforce Densities and Flexible Space Planning of Contemporary Offices
Location:
San Francisco, CA
Client:
KR 350 Mission, LLC
Scale:
450,000 square feet
27 levels above grade
1
LEED Certification:
Platinum
Specialties:
Delivery Model:
GMP/GMAX
Architect:
Skidmore, Owings, & Merrill, LLP
Salesforce East located in San Francisco, CA is a ground-up, Type I concrete office project. The project is designed by Skidmore, Owings, & Merrill, LLP. This GMP project totals 450,000 SF throughout one structure with 27 levels above grade and three levels below grade.
Situated at the corner of Mission and Fremont streets directly across from the Transbay Transit Center, the project features an open plan workspace concept in a high-rise office environment.
The concrete and glass tower features a side-wall service core, stormwater collection, and underfloor air systems; 11-foot exterior glass walls that allow for large, open floor plates; high, uncluttered ceilings; and an abundance of natural light. The tower features a massive open-air entry lobby with a three-story LED digital media canvas.
Webcor self-performed concrete and carpentry. This project is LEED Platinum®.
Construction is what we do best - it’s no surprise that we live and breathe every aspect of construction.
View all projectsWith emphasis on attracting and retaining top talent, this office is envisioned to be a ‘technology hub’ for up to 120 employees
...
With a capacity of over 4,500 employees, this downtown building’s marquee features 360-degree views
...
The World’s 1st TRUE Precertified Construction Site in Recognition of Zero Waste Efforts.
...