Mount Zion 2130 Post St Seismic Retrofit

2130 Post Street was truly a seismic surgery; weave in new structural components around existing MEP systems and finishes, then cover them up and blend them in.

Key Statistics

Location:

San Francisco, CA

Client:

Regents of the University of California

Scale:

119,000 Square Feet

7 Levels

71 Residences

1 Building

LEED Certification:

Specialties:

Seismic Retrofit, Renovation

Delivery Model:

CMAR

Architect:

Gayner Engineers, Inc.

Seismic retrofit of a post-tensioned concrete project with a construction cost of $17.5 M. This CMAR project totals 119,000 SF throughout one structure with seven levels above grade and a subterranean parking level. The project scope includes a seismic retrofit of the 71-unit residential building as well as MEP upgrades, accessibility upgrades, fire-life-safety improvements, and security enhancements. Seismic Improvements include installation of shear walls, supplemental columns and concrete collector elements, and strengthening of interior and exterior columns.

RELATED PROJECTS

Construction is what we do best - it’s no surprise that we live and breathe every aspect of construction.

View all projects

UCSF Parnassus Heights Health Sciences Instruction and Research Seismic Program

This complex was constructed in 1966 and provides approximately 440,000 gross-square-foot of laboratory spaces, lecture halls and other support spaces to the University.

...

UCSF New Hospital at Parnassus Heights

he New Hospital at UCSF Helen Diller Medical Center at Parnassus Heights (NHPH) is being delivered by a unique, tri-venture partnership among Herrero Builders, Inc., The Boldt Company, and Webcor, known as the HBW group.

...

SJSU Audiology Renovation

This project enabled San Jose State to graduate their first class of audiology doctorate students.

...