Bay Meadows Station 3
Wake Up, Grab a Coffee, and Head Into the Office... All Within a Five Minute Time Span Thanks to This True, Mixed-Use Campus Development
Wake Up, Grab a Coffee, and Head Into the Office... All Within a Five Minute Time Span Thanks to This True, Mixed-Use Campus Development
Location:
San Mateo, CA
Client:
Wilson Meany
Scale:
174,000 square feet
4 levels above grade
1 building
LEED Certification:
LEED Gold
Specialties:
Delivery Model:
GMP/GMAX
Architect:
HOK
Bay Meadows Station 3 located in San Mateo, CA is a ground-up, Type I concrete office project. The project totals 174,000 SF throughout one structure with four levels above grade and three levels below grade.
The Class A office is a portion of the greater 763,000 SF of office space provided by the Bay Meadows mixed-use campus development. The project features a two-story open entrance lobby with a 14’ glass curtain wall system, large flexible floor plates with 11’8” floor-to-ceiling heights, state-of-the art building operating systems, surface parking, patios, bicycle storage, and locker room facilities with showers. Webcor self-performed concrete. This project is LEED Gold®.
Construction is what we do best - it’s no surprise that we live and breathe every aspect of construction.
View all projectsWith emphasis on attracting and retaining top talent, this office is envisioned to be a ‘technology hub’ for up to 120 employees
...
With a capacity of over 4,500 employees, this downtown building’s marquee features 360-degree views
...
The World’s 1st TRUE Precertified Construction Site in Recognition of Zero Waste Efforts.
...